Winstone Properties Ltd.

WINSTONE Properties Ltd.

Winstone-10 · Ongoing — Residential Exclusive Condominium

WINSTONE
DREAM PARK

Plot #31 & 4 · Road #103 & 111
Sector #1 · United City · Dhaka
Opposite Chef's Table Courtside
View profile
Original Winstone Dream Park architectural render isolated from the source profile
20 KathaB+G+15 source cover38% living · 62% greenApprox. 50 Crore
Project profile · 01 / 47
02

Executive snapshot

WINSTONE DREAM PARK

Executive snapshot

A residential landmark shaped around open space.

01

Project

WINSTONE DREAM PARK
02

Project code

Winstone-10
03

Status

Ongoing · Residential Exclusive Condominium
04

Type

Exclusive condominium apartment project
05

Land owners

Owners of Plot #31 & 4, Road #103 & 111, Sector #1, United City, Dhaka
06

Developer

WINSTONE Properties Ltd.
07

Project area

20 Katha
08

Approx. project cost

50 Crore
09

Source cover configuration

B+G+15
10

Source land use

38% living area · 62% green space
11

Road access

40-ft road on the south · 30-ft road on the north
WINSTONE Properties Ltd.02 / 47
03

Preface & speciality

WINSTONE DREAM PARK

Preface & speciality

Service that continues beyond construction.

01

Continuous service of the highest quality throughout the professional term of even the most complex project.

02

A professional and totally comprehensive property service through one reliable point of contact across property transactions.

03

Sound structural design and good construction practices for safety during earthquakes and cyclones, based on the Bangladesh National Building Code.

04

BSTI-approved construction materials used according to the proper rules and regulations of RAJUK.

05

Commitment to hand over the project within the agreed and scheduled period with quality product as per agreement.

06

Prime Dhaka locations selected for access to all types of communication facilities.

07

Competitive prices, flexible and affordable payment modes, and available loan facilities with minimum interest rate if needed.

08

After-sales services for clients’ peaceful and comfortable living.

WINSTONE Properties Ltd.03 / 47
04

Detailed project outline

WINSTONE DREAM PARK

Detailed project outline

Defined by scale, structure and considered planning.

Address
Plot #31 & 4, Road #103 & 111, Sector #1, United City, Dhaka — just opposite Chef's Table Courtside
Detailed-outline configuration
B+G+16 = 18 storied apartment building on R.C.C-frame structure
Ground-floor height
27 ft
Apartments
58
Apartment sizes
A — 1450 SFT · B — 1450 SFT · C — 1850 SFT · D — 2550 SFT (approx.)
Facing
South and North
Architect
Mr. Tanwir Seraj
Structural engineers
Anamul Haque Sozib, B.Sc. in Civil Engineering (AUST) · Engr. Md. Azad Ali, B.Sc. in Civil Engineering (DUET), MIEB-33393
Expected handover
December 2028

Construction standard

Fully stone-structured building with excellent finishing works.100% BSTI-approved construction materials.
WINSTONE Properties Ltd.04 / 47
05

Ground floor & parking

WINSTONE DREAM PARK

Ground floor & parking

Arrival, movement and parking—clearly resolved.

Original ground-floor and parking plan
Ground FloorOriginal plan visual, extracted from the source document.
Parking

Parking spaces are arranged in the basement and ground floor.

Driveway finish

Combination of pea gravel with MCF and clinker paver stripe.

WINSTONE Properties Ltd.05 / 47
06

Mezzanine amenities

WINSTONE DREAM PARK

Mezzanine amenities

Shared rituals of wellbeing and convenience.

Original mezzanine amenities plan
MezzanineOriginal mezzanine architectural visual.
SalonGymLaundrySwimming pool
WINSTONE Properties Ltd.06 / 47
07

Typical floor

WINSTONE DREAM PARK

Typical floor

Four residences arranged around a composed core.

Original typical floor plan
Typical FloorOriginal typical-floor plan extracted from the supplied source.
A · 1450 SFTB · 1450 SFTC · 1850 SFTD · 2550 SFT
WINSTONE Properties Ltd.07 / 47
08

Axonometric

WINSTONE DREAM PARK

Axonometric

Spatial relationships, expressed in three dimensions.

Original axonometric apartment study
Axonometric ViewOriginal axonometric study from the source profile.
WINSTONE Properties Ltd.08 / 47
09

Private residence

WINSTONE DREAM PARK

Private residence

Unit A · 1450 SFT

Unit A original floor plan
Unit AOriginal unit plan extracted from the supplied source.
1450 SFT approx.

3 (three) beds, drawing, dining, 3 (three) toilets, kitchen & balconies at appropriate locations.

WINSTONE Properties Ltd.09 / 47
10

Private residence

WINSTONE DREAM PARK

Private residence

Unit B · 1450 SFT

Unit B original floor plan
Unit BOriginal unit plan extracted from the supplied source.
1450 SFT approx.

3 (three) beds, drawing, dining, 3 (three) toilets, kitchen & balconies at appropriate locations.

WINSTONE Properties Ltd.10 / 47
11

Private residence

WINSTONE DREAM PARK

Private residence

Unit C · 1850 SFT

Unit C original floor plan
Unit COriginal unit plan extracted from the supplied source.
1850 SFT approx.

3 (three) beds, drawing, dining, 3 (three) toilets, kitchen & balconies at appropriate locations.

WINSTONE Properties Ltd.11 / 47
12

Private residence

WINSTONE DREAM PARK

Private residence

Unit D · 2550 SFT

Unit D original floor plan
Unit DOriginal unit plan extracted from the supplied source.
2550 SFT approx.

4 (four) beds, drawing, dining, family living, 4 (four) toilets, kitchen & balconies at appropriate locations.

WINSTONE Properties Ltd.12 / 47
13

Apartment features

WINSTONE DREAM PARK

Apartment features

A precise palette of material and finish.

Apartment specification

Main door frame
As per design (Segun/Teachambul/Loha/equivalent), up to 7'-0" height
Main door shutter
Solid decorative — Segun (CTG.) door shutter
Main door fittings
Imported door chain, check viewer, door knocker and door handle lock; apartment number plate as per architectural design
Bedroom door frame
As per design (Segun/Teachambul/Loha/equivalent), up to 7'-0" height
Bedroom door shutter
Garjon veneered flush door; imported round mortise lock; other necessary fittings and polish
Bathroom doors
Plastic door / WPC door / equivalent
Kitchen doors
As per design (Teachambul/Loha/equivalent), up to 7'-0" height; Garjon veneered flush door; imported round mortise lock; necessary fittings and polish
Windows
Aluminum sliding windows as per architectural design; KAI / Altech / BTA; 5 mm thick clear glass
Walls
Exterior walls as per architectural design; interior 5-inch brick wall with smooth finish
Living & dining tiles
Mirror polish tiles, 24" × 24" (Sunpower/China/RAK)
Bedroom tiles
Mirror polish tiles, 24" × 24" (Sunpower/China/RAK)
Verandah tiles
Mirror polish tiles, 24" × 24" (Sunpower/China/RAK)
Interior paint
Plastic paint (Berger/Asian/equivalent)
Exterior paint
Weather coat / master coat paint (Berger/Asian/equivalent)
Grill & railing
Synthetic enamel paint (Berger/Asian/equivalent)
Polish
Spirit polish

Shared amenities

  • 01Swimming pool
  • 02Gym
  • 03Convention hall
  • 04Departmental store
  • 05Pharmacy
  • 06Walkway
  • 07Café
  • 08Salon
  • 09Laundry
  • 10Reception
  • 11Children's play zone
  • 12Green zone
WINSTONE Properties Ltd.13 / 47
14

Technical specification

WINSTONE DREAM PARK

Technical specification

Electrical, bathroom and kitchen schedule.

Electrical

Switches and sockets
Energy Super (China) / equivalent, with proper earthing connection
Power outlets
ABB / Chinese / equivalent
Circuit breakers
All cables will be of good quality (BRB / BBS / equivalent)
Cables
Concealed type and best-quality PVC conduits embedded properly
Wiring type
Adequate lights, power outlets and dish-line provisions on each floor
Electrical provisions
Independent meter will be provided in all apartments / as per design
Common areas
Adequate security lights within the compound, car parking and common spaces

Bathroom

Wall and floor tiles
RAK / Charu / equivalent ceramic tiles up to 7'-0" height with matching floor tiles
Master toilet
RAK / equivalent combiset with cabinet basin; over-counter basin; marble-tile countertop only for master bathrooms
Master fittings
Hand shower, basin mixer, shower mixer, push shower and CP grating — Sharif / Sattar / equivalent
Hot & cold-water lines
Only provision for the electric geyser will be provided
Child & common toilet
RAK / equivalent pedestal basin
Child & common fittings
Hand shower, basin mixer, shower mixer, push shower and CP grating — Sharif / Sattar / equivalent

Kitchen

Wall tiles
RAK / Charu / equivalent ceramic tiles up to 7'-0" height
Floor tiles
Matching floor tiles
Worktop
24" × 24" mirror polish / matt tiles (China / RAK / equivalent)
Double burner
Provision for double-burner gas outlet
Washing corner
At kitchen verandah / as per design
Stainless-steel sink
Single-bowl single-tray sink (China / equivalent)
Sink mixer & CP fittings
Sharif / Sattar / equivalent
Hot water
Only provision for the electric geyser will be provided
Exhaust fan
Square shape (National Deluxe / Hatari)
WINSTONE Properties Ltd.14 / 47
15

Terms & registration

WINSTONE DREAM PARK

Terms & registration

A transparent framework from allotment to handover.

01

Booking & allotment

Application is submitted on the prescribed signed form with required documents and booking money. Acceptance is followed by a specified down-payment period and an allotment letter with payment schedule and conditions. Failure to pay the down payment in time cancels the booking and forfeits the booking money. Allotment is generally first come, first served.

02

Booking money & down payment

Booking money is Tk. 20,00,000 (twenty lac) only. Down payment must be not less than 30% of the total sales price as settled and agreed.

03

Mode of payment

All payments shall be made by A/C payee cheque, bank draft or payment order in favour of WINSTONE Properties Ltd., against company receipt.

04

Company's rights

The company may make required changes to plan, design and specifications when necessary for the project or unavoidable reasons. Final apartment measurement before handover is accepted by the parties and price adjusted. Limited internal-layout changes may be requested at the allottee’s cost with at least 60 days’ prior notice and company approval.

05

Utility & incidental charges

Gas, water, sewerage, electrical sub-station and power-connection fees, security deposits and related costs are excluded from the apartment price and payable to the company at actual cost for payment to the concerned authorities.

06

Completion & handover

Handover is subject to adherence to the payment schedule. Apartment and parking possession, if applicable, is delivered after completion and full payment of instalments, charges and dues.

07

Registration

The buyer bears all ownership-transfer and registration costs, including stamp duty, registration fees, documentation, legal costs, sale permission, gain tax, VAT, other government taxes and incidental costs.

08

Owner's association

Each owner must join the owners’ association and, before possession, deposit Tk. 25,000 (twenty-five thousand) with the company as the association reserve fund for initial common services and management expenses.

WINSTONE Properties Ltd.15 / 47
16

Location & conveniences

WINSTONE DREAM PARK

Location & conveniences

Connected to the city. Open to the horizon.

Original Winstone Dream Park location map
Location MapOriginal source map · United City, Dhaka
Original nearby context mapOriginal neighbourhood context study

Just opposite Chef's Table Courtside · Nearby

United Hospital-2United Convention HallMasjid Al MustafaNatun BazarGulshan-2United International UniversitySir John Wilson SchoolChef's Table Courtside
WINSTONE Properties Ltd.16 / 47
17

Full project-cost summary · 1 of 3

WINSTONE DREAM PARK

Full project-cost summary · 1 of 3

Documented project expenditure.

SL#DescriptionAmountNumber of FloorAmount
1Shore Piling (20" Dia)20,106,68620,106,686
2Situ Piling (24" Dia)33,893,36733,893,367
3Pile Cap5,640,8525,640,852
4Basement Floor23,194,22723,194,227
5Retaining Wall3,203,0753,203,075
6Under Ground Water Reservoir3,788,0763,788,076
7Basement Floor Column, Stair, Ram & Roof Slab16,969,67316,969,673
8Ground Floor20,880,82620,880,826
9Each Floor Civil Work9,630,51016154,088,154
10Tiles Work4,279,8201668,477,128

All values and descriptions are preserved exactly from the supplied 30-line source schedule. No recalculation has been applied.

WINSTONE Properties Ltd.17 / 47
18

Full project-cost summary · 2 of 3

WINSTONE DREAM PARK

Full project-cost summary · 2 of 3

Documented project expenditure.

SL#DescriptionAmountNumber of FloorAmount
11Paints Work1,583,4501625,335,203
12Each Floor Grill, Thai & Door1,829,0241629,264,384
13Each Floor Electric Materials751,9601612,031,360
14Each Floor Sanitary Materials896,0281614,336,448
15Lift12,000,00012,000,000
16Generator5,000,0005,000,000
17Sub-Station5,000,0005,000,000
18Swimming Pool5,000,0005,000,000
19Community Living(Furnished)2,500,0002,500,000
20ZIM2,500,0002,500,000

All values and descriptions are preserved exactly from the supplied 30-line source schedule. No recalculation has been applied.

WINSTONE Properties Ltd.18 / 47
19

Full project-cost summary · 3 of 3

WINSTONE DREAM PARK

Full project-cost summary · 3 of 3

Total · BDT 500,000,000

SL#DescriptionAmountNumber of FloorAmount
21Departmental Store3,000,0003,000,000
22Laundry1,000,0001,000,000
23Café1,000,0001,000,000
24Receiption500,000500,000
25Main Gate1,000,0001,000,000
26CCTV , Intercom Etc.1,000,0001,000,000
27Plan Pass and Working Design7,500,000
28Administrative Cost9,000,000
29Marketing Cost7,200,000
30Utility and Others5,590,541
Total project costBDT 500,000,000

All values and descriptions are preserved exactly from the supplied 30-line source schedule. No recalculation has been applied.

WINSTONE Properties Ltd.19 / 47
20

Detail project cost · item 1 of 14

WINSTONE DREAM PARK

Detail project cost · item 1 of 14

Shore Piling (20" Dia)

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
Shore Piling RCC Work (1:1.5:3)402.19127023652cft
Cement (Supercrete)5203bag5502,861,892
2.5 FM Sand11826cft70827,820
Stone (Pakura Black Stone)21287cft2355,002,398
20 mm dia Rod39.58127063990kg
10 mm dia Rod873.141.1727016153kg
Total Rod (KSRM)80143kg1028,174,576
Pile Boring Charge401127010800rft3003,240,000
Sub Total20,106,686

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.20 / 47
21

Detail project cost · item 2 of 14

WINSTONE DREAM PARK

Detail project cost · item 2 of 14

Situ Piling (24" Dia)

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
Situ Piling RCC Work (1:1.5:3)943.14112236009.52cft
Cement (Supercrete)7922bag5504,357,152
2.5 FM Sand18005cft701,260,333
Stone (Pakura Black Stone)32409cft2357,616,013
25 mm dia Rod99.25101122141669.45kg
10 mm dia Rod2453.141.512226431kg
Total Rod(KSRM)168101kg10217,146,268
Pile Boring Charge961112211712rft3003,513,600
Sub Total33,893,367

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.21 / 47
22

Detail project cost · item 3 of 14 · sheet 1 of 2

WINSTONE DREAM PARK

Detail project cost · item 3 of 14 · sheet 1 of 2

Pile Cap

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
CC Work of Pile Cap (1:3:6)
P-17.54.50.251193cft
P-27.57.50.2517239cft
P-325.2510.750.25168cft
400cft
Cement (Supercrete)48bag55026,382
2.5 FM Sand200cft7013,991
Stone (Pakura Black Stone)360cft23584,544
RCC Work of Pile Cap (1:1.5:3)
P-17.54.53.5111299cft
P-27.57.54173825cft
P-325.2510.75411086cft
6210cft
Cement (Supercrete)1366bag550751,425
2.5 FM Sand3105cft70217,354
Stone (Pakura Black Stone)5589cft2351,313,441
P-1
12 mm dia Rod (Binder)26111177kg
32 mm dia Rod (Bottom)15611113312kg
32 mm dia Rod (Bottom)21011114458kg
P-2
12 mm dia Rod (Binder)321117147kg
32 mm dia Rod (Bottom)588111719292kg
P-3

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.22 / 47
23

Detail project cost · item 3 of 14 · sheet 2 of 2

WINSTONE DREAM PARK

Detail project cost · item 3 of 14 · sheet 2 of 2

Pile Cap

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
12 mm dia Rod (Binder)7411120kg
32 mm dia Rod (Bottom)9841111900kg
32 mm dia Rod (Bottom)12941112497kg
Total Rod (KSRM)31703kg1023,233,714
Sub Total5,640,852

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.23 / 47
24

Detail project cost · item 4 of 14

WINSTONE DREAM PARK

Detail project cost · item 4 of 14

Basement Floor

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
CC Work of Basement (1:3:6)200720.2513600cft
Deduction of Pile Cap CC Work400cft
3200cft
Cement (Supercrete)384bag550211,218
2.5 FM Sand1600cft70112,009
Stone (Pakura Black Stone)2880cft235676,856
RCC Work of Basement (1:1.5:3)200721.5121600cft
Cement (Supercrete)4752bag5502,613,600
2.5 FM Sand10800cft70756,000
Stone (Pakura Black Stone)19440cft2354,568,400
20 mm dia Rod (Bottom)2101117227090kg
20 mm dia Rod (Bottom)74.51147626597kg
16 mm dia Rod (Top)2081117217172kg
16 mm dia Rod (Top)741147616908kg
12 mm dia Rod (Chair)4.161123042588kg
Total Rod (KSRM)90354kg1029,216,144
Civil Contructor Charge200721114400sft3505,040,000
Sub Total23,194,227

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.24 / 47
25

Detail project cost · item 5 of 14

WINSTONE DREAM PARK

Detail project cost · item 5 of 14

Retaining Wall

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
RCC Work of Retaining Wall (1:1.5:3)540.660.839.514263
Cement (Supercrete)938bag550515,836
2.5 FM Sand2132cft70149,209
Stone (Pakura Black Stone)3837cft235901,647
16 mm dia Rod (Out Side)11.83116553722kg
16 mm dia Rod (Out Side)7.33116552306kg
16 mm dia Rod (In Side)11.83116513699kg
16 mm dia Rod (In Side)7.33116512292kg
10 mm dia Rod (Binder)Out Side56511192018kg
10 mm dia Rod (Binder) In Side56211192006kg
Total Rod (KSRM)16043kg1021,636,384
Sub Total3,203,075

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.25 / 47
26

Detail project cost · item 6 of 14

WINSTONE DREAM PARK

Detail project cost · item 6 of 14

Under Ground Water Reservoir

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
Area of UGWR150124.518100cft
229392Ltr
RCC Work of UGWR (1:1.5:3)
Floor152141.513192cft
Wall32814.511476cft
4668cft
Cement (Supercrete)1027bag550564,828
2.5 FM Sand2334cft70163,380
Stone (Pakura Black Stone)4201cft235987,282
20 mm dia Rod (Bottom)159.511344085kg
20 mm dia Rod (Bottom)14113713893kg
16 mm dia Rod (Top)1581134.152590kg
16 mm dia Rod (Top)14113712491kg
12 mm dia Rod (Chair)4.1611340.5382kg
16 mm dia Rod (Out Side)8.33116642655kg
16 mm dia Rod (In Side)8.33116562623kg
10 mm dia Rod (Binder)Out Side341119577kg
10 mm dia Rod (Binder) In Side337119570kg
Total Rod (KSRM)19866kg1022,026,322
Plaster Work (1:4) with Net finishing15012111800sft
32414.511458sft
3258sft
Cement (Supercrete)65bag55035,838
1.5 FM Sand261cft4010,426
Sub Total3,788,076

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.26 / 47
27

Detail project cost · item 7 of 14 · sheet 1 of 4

WINSTONE DREAM PARK

Detail project cost · item 7 of 14 · sheet 1 of 4

Basement Floor Column, Stair, Ram & Roof Slab

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
RCC Work of Column (1:1.5:3)
C-12.671.178.3311286cft
C-23.171.178.3317525cft
C-33.330.838.33123cft
Shear Wall10.670.838.333221cft
RCC Work of Stair (1:1.5:3)
West Slab9.1740.5237cft
Trade40.830.5915cft
Landing10.5850.5126cft
Landing Beam10.581.170.83110cft
RCC Work of Ram (1:1.5:3)
West Slab45140.751473cft
Beam451.2512113cft
1729cft
Cement (Supercrete)380bag550209,226
2.5 FM Sand865cft7060,520
Stone (Pakura Black Stone)1556cft235365,713
Column
32 mm dia Rod (C-1)20111325095kg
32 mm dia Rod (C-2)201127210499kg
32 mm dia Rod (C-3)201110386kg
32 mm dia Rod (Shear Wall)20111204632kg
10 mm dia Rod (C-1)11.08114951031kg
10 mm dia Rod (C-2)16.67117652397kg

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.27 / 47
28

Detail project cost · item 7 of 14 · sheet 2 of 4

WINSTONE DREAM PARK

Detail project cost · item 7 of 14 · sheet 2 of 4

Basement Floor Column, Stair, Ram & Roof Slab

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
10 mm dia Rod (C-3)13.331145113kg
10 mm dia Rod (Shear Wall)52111351320kg
Stair
16 mm dia Rod (Landing Beam)11.511950kg
12 mm dia Rod (West Slab)20.51124133kg
12 mm dia Rod (West Slab)9112458kg
12 mm dia Rod (West Slab)8112452kg
10 mm dia Rod ((Landing Beam)4.5112420kg
10 mm dia Rod (West Slab)3.83116043kg
10 mm dia Rod (Landing Slab)10.33112243kg
Ram
20 mm dia Rod (Ram Beam)461118969kg
16 mm dia Rod (Ram Slab)5511661742kg
16 mm dia Rod (Ram Slab)14112161452kg
10 mm dia Rod (Ram Beam)4.8311216196kg
Total Rod (KSRM)30231kg1023,083,587
RCC Work of Roof Slab (1:1.5:3)200720.517200cft
Deduction
Ram45140.51315cft
Stair14.58.920.5165cft
Lift96.50.5259cft
438cft
Roof Slab6762cft
Beam (Long Section)20011.3341064cft

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.28 / 47
29

Detail project cost · item 7 of 14 · sheet 3 of 4

WINSTONE DREAM PARK

Detail project cost · item 7 of 14 · sheet 3 of 4

Basement Floor Column, Stair, Ram & Roof Slab

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
Beam (Short Section)7211.338766cft
8592cft
Cement (Supercrete)1890bag5501,039,621
2.5 FM Sand4296cft70300,717
Stone (Pakura Black Stone)7733cft2351,817,189
Slab
10 mm dia Rod207.5111716687kg
10 mm dia Rod73.5114766580kg
12 mm dia Rod151113685540kg
12 mm dia Rod121119046169kg
Beam
25 mm dia Rod (Long Section)213.6711369000kg
1511961685kg
25 mm dia Rod (Short Section)75.6711726374kg
1211961348kg
10 mm dia Rod (Long Section)5.171119041851kg
10 mm dia Rod (Short Section)5.171113681330kg
Total Rod (KSRM)46564kg1024,749,518
Plaster Work (1:4)
Basement Roof Slab Ceiling200721114400sft
Wall54419.515168sft
Column7.6818.1711690sft
8.6818.17171206sft
Beam2003.67142936sft

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.29 / 47
30

Detail project cost · item 7 of 14 · sheet 4 of 4

WINSTONE DREAM PARK

Detail project cost · item 7 of 14 · sheet 4 of 4

Basement Floor Column, Stair, Ram & Roof Slab

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
723.67182114sft
26514sft
Cement (Supercrete)398bag550218,738
1.5 FM Sand2121cft4084,844
Civil Contructor Charge200721114400sft3505,040,000
Sub Total16,969,673

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.30 / 47
31

Detail project cost · item 8 of 14 · sheet 1 of 4

WINSTONE DREAM PARK

Detail project cost · item 8 of 14 · sheet 1 of 4

Ground Floor

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
RCC Work of Column (1:1.5:3)
C-12.512711743cft
C-23127171377cft
C-33.330.8327175cft
Shear Wall10.670.83273717cft
RCC Work of Stair (1:1.5:3)
West Slab9.1740.512220cft
Trade40.830.55490cft
Landing10.5850.56159cft
Landing Beam10.581.170.83662cft
RCC Work of Swimming,Cafe (1:1.5:3)
Floor Slab341010.523410cft
Beam575.8311.3321532cft
RCC Work of Gr.fl Roof Slab (1:1.5:3)560010.512800cft
Beam971.1711.3311292cft
12475cft
Cement (Supercrete)2744bag5501,509,463
2.5 FM Sand6237cft70436,621
Stone (Pakura Black Stone)11227cft2352,638,441
Column
32 mm dia Rod (C-1)13.171139610066kg
32 mm dia Rod (C-2)13.171181620741kg
32 mm dia Rod (C-3)13.171130763kg
32 mm dia Rod (Shear Wall)13.17113609151kg

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.31 / 47
32

Detail project cost · item 8 of 14 · sheet 2 of 4

WINSTONE DREAM PARK

Detail project cost · item 8 of 14 · sheet 2 of 4

Ground Floor

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
10 mm dia Rod (C-1)11.08116931444kg
10 mm dia Rod (C-2)16.671110713356kg
10 mm dia Rod (C-3)13.331163158kg
10 mm dia Rod (Shear Wall)52111891848kg
Stair
16 mm dia Rod (Landing Beam)11.51154298kg
12 mm dia Rod (West Slab)20.511144797kg
12 mm dia Rod (West Slab)911144350kg
12 mm dia Rod (West Slab)811144311kg
10 mm dia Rod ((Landing Beam)4.511144122kg
10 mm dia Rod (West Slab)3.8311360259kg
10 mm dia Rod (Landing Slab)10.3311132256kg
Swimming,Cafe Slab
10 mm dia Rod59.92115566263kg
12 mm dia Rod121116685404kg
Beam
25 mm dia Rod575.83111812127kg
25 mm dia Rod12112223117kg
10 mm dia Rod5.171127402663kg
Gr.floor Roof Slab
10 mm dia Rod76.33113605166kg
12 mm dia Rod121112604082kg
12 mm dia Rod12117202333kg
Beam

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.32 / 47
33

Detail project cost · item 8 of 14 · sheet 3 of 4

WINSTONE DREAM PARK

Detail project cost · item 8 of 14 · sheet 3 of 4

Ground Floor

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
25 mm dia Rod971.1711910226kg
25 mm dia Rod12111562190kg
10 mm dia Rod5.171119401886kg
Total Rod (KSRM)105377kg10210,748,451
5" Brick worl (1:4)
Wall ( Boundary)5241814192sft
Wall (swimming floor)233.3618.1723813sft
8005sft
Cement (Supercrete)220bag550121,077
1.5 FM Sand1281cft4051,233
Brick (Auto)40026nos15600,383
Plaster Work (1:4)
Ceiling34101126820sft
56001115600sft
Column7127112079sft
8127173672sft
Shear Wall93.4212712522sft
Stair west slab9.174112440sft
Landing slab8.924.6716250sft
Wall (swimming floor)233.3618.1747626sft
Wall ( Boundary)5241828384sft
37394sft
Cement (Supercrete)561bag550308,498
1.5 FM Sand2991cft40119,660

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.33 / 47
34

Detail project cost · item 8 of 14 · sheet 4 of 4

WINSTONE DREAM PARK

Detail project cost · item 8 of 14 · sheet 4 of 4

Ground Floor

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
Civil Contructor Charge1242011112420sft3504,347,000
Sub Total20,880,826

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.34 / 47
35

Detail project cost · item 9 of 14 · sheet 1 of 3

WINSTONE DREAM PARK

Detail project cost · item 9 of 14 · sheet 1 of 3

Each Floor Civil Work

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
RCC Work of Column (1:1.5:3)
C-12.519.511261cft
C-2319.517485cft
C-33.330.839.5126cft
Shear Wall10.670.839.53252cft
RCC Work of Stair (1:1.5:3)
West Slab9.1740.5473cft
Trade40.830.51830cft
Landing10.5850.5253cft
Landing Beam10.581.170.83221cft
RCC Work of 1st Floor (1:1.5:3)560010.512800cft
Beam971.1711.3311292cft
5293cft
Cement (Supercrete)1164bag550640,423
2.5 FM Sand2646cft70185,246
Stone (Pakura Black Stone)4763cft2351,119,417
Column
32 mm dia Rod (C-1)13.17111323355kg
32 mm dia Rod (C-2)13.17112726914kg
32 mm dia Rod (C-3)13.171110254kg
32 mm dia Rod (Shear Wall)13.17111203050kg
10 mm dia Rod (C-1)11.0811231481kg
10 mm dia Rod (C-2)16.67113571119kg
10 mm dia Rod (C-3)13.33112153kg

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.35 / 47
36

Detail project cost · item 9 of 14 · sheet 2 of 3

WINSTONE DREAM PARK

Detail project cost · item 9 of 14 · sheet 2 of 3

Each Floor Civil Work

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
10 mm dia Rod (Shear Wall)521163616kg
Stair
16 mm dia Rod (Landing Beam)11.5111899kg
12 mm dia Rod (West Slab)20.51148266kg
12 mm dia Rod (West Slab)91148117kg
12 mm dia Rod (West Slab)81148104kg
10 mm dia Rod ((Landing Beam)4.5114841kg
10 mm dia Rod (West Slab)3.831112086kg
10 mm dia Rod (Landing Slab)10.33114485kg
1st floor Roof Slab
10 mm dia Rod76.33113605166kg
12 mm dia Rod121112604082kg
12 mm dia Rod12117202333kg
Beam
25 mm dia Rod971.1711910226kg
25 mm dia Rod12111562190kg
10 mm dia Rod5.171119401886kg
Total Rod (KSRM)42523kg1024,337,355
5" Brick work (1:4)
Wall1130.8719.5110743sft
Deduction1649sft
9094sft
Cement (Supercrete)250bag550137,547
1.5 FM Sand1455cft4058,202

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.36 / 47
37

Detail project cost · item 9 of 14 · sheet 3 of 3

WINSTONE DREAM PARK

Detail project cost · item 9 of 14 · sheet 3 of 3

Each Floor Civil Work

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
Brick (Auto)45470nos15682,051
Plaster Work (1:4)
Ceiling56001115600sft
False slab472.2111472sft
Shear Wall93.42191841sft
Stair west slab9.17414147sft
Landing slab8.924.671283sft
Wall in side7987.841117988sft
Wall out side49801114980sft
20111sft
Cement (Supercrete)302bag550165,915
1.5 FM Sand1609cft4064,355
Civil Contructor Charge56001115600sft4002,240,000
Sub Total9,630,510

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.37 / 47
38

Detail project cost · item 10 of 14

WINSTONE DREAM PARK

Detail project cost · item 10 of 14

Tiles Work

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
Pavement tiles Gr.floor200721113582sft50679,108
Cement (Supercrete)319bag550175,549
White Cement7bag150010,187
1.5 FM Sand1222cft4048,896
Tiles fitting Charge13582sft30407,465
Swimming,Cafe Floor Tiles34101126820sft1501,023,000
Cement (Supercrete)160bag55088,149
White Cement3bag15005,115
1.5 FM Sand614cft4024,552
Tiles fitting Charge6820sft40272,800
1st Floor
Floor tiles41421114142sft150621,300
Wall tiles toilet19761111976sft90177,840
Wall tiles kitchen846111846sft9076,140
Floor tiles toilet & kitchen741111741sft9066,690
Lobbi tiles44.17711309sft12037,103
Stair Landing tiles8.92414143sft12017,126
Stair Trade tiles41136144sft12017,280
Stair Rise tiles40.514080sft1209,600
8381sft
Cement (Supercrete)197bag550108,323
White Cement4bag15006,286
1.5 FM Sand754cft4030,171
Tiles fitting Charge8381sft45377,141
Sub Total4,279,820

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.38 / 47
39

Detail project cost · item 11 of 14

WINSTONE DREAM PARK

Detail project cost · item 11 of 14

Paints Work

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
Basement Floor2651411126514sft
Ground Floor3739411137394sft
1st Floor2011111120111sft
84019sft
Water Based Sealer756.2Ltr240181,481
Wall Putty3360.8kg70235,253
Chalk Powder (25.0 kg)840.2kg2521,005
Plastic Paint1386.3Ltr390540,662
Painting Charge84019.0sft7588,133
Enamel Paint for Grill Painting19.5Ltr3907,593
Thinner9.7Ltr1801,752
Grill Painting Charge1082sft77,571
Sub Total1,583,450

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.39 / 47
40

Detail project cost · item 12 of 14

WINSTONE DREAM PARK

Detail project cost · item 12 of 14

Each Floor Grill, Thai & Door

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
Window Grill650sft200130,000
Verandh Railing309.54sft30092,862
Stair Railing122.04sft30036,612
Sliding Window Thai650sft550357,500
Sliding Door Thai371sft550204,050
Teak Wood for Main Door Frame & Shutter4nos90000360,000
Teak Wood for Internal Door Frame17nos25000425,000
Flush Door Shutter with Fitting17nos7000119,000
PVC Door13nos8000104,000
Sub Total1,829,024

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.40 / 47
41

Detail project cost · item 13 of 14 · sheet 1 of 2

WINSTONE DREAM PARK

Detail project cost · item 13 of 14 · sheet 1 of 2

Each Floor Electric Materials

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
1x1.50 rm Cable (100 m) BRB28.0coil2,91581,620
1x2.50 rm Cable (100 m) BRB20.0coil4,65093,000
1x3.00 rm Cable (100 m) BRB6.0coil5,60033,600
1x4.00 rm Cable (100 m) BRB6.0coil7,24043,440
1x1.00 rm Cable (100 m) BRB4.0coil1,9507,800
10 rm Cable (100 m) BRB4.0coil17,78071,120
3 Pier Cable (100 m) BRB4.0coil4,76519,060
Dish Cable (100 m) (RG-6) BRB4.0Role6,67526,700
3 Gang Switch (Wener)36.0Nos29010,440
2 Gang Switch (Wener)28.0Nos2256,300
1 Gang Switch (Wener)20.0Nos1402,800
20 A Combined Switch12.0Nos4905,880
15 A Combined Switch20.0Nos4659,300
13 A Combined Switch56.0Nos32518,200
Fan Dimmer (Wener)28.0Nos46012,880
6"x6" Round Fan Cover28.0Nos501,400
7"x5" Joint Box Cover30.0Nos401,200
Telephone Switch (Wener)8.0Nos2852,280
T V Switch (Wener)8.0Nos2852,280
Calling Bell Push (Wener)4.0Nos2851,140
63 A Double Circuit Breaker ABB4.0Nos3,05012,200
20 A Double Circuit Breaker ABB36.0Nos68024,480
10 A Single Circuit Breaker ABB56.0Nos68038,080
MK 1 Gang Steel Box48.0Nos401,920

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.41 / 47
42

Detail project cost · item 13 of 14 · sheet 2 of 2

WINSTONE DREAM PARK

Detail project cost · item 13 of 14 · sheet 2 of 2

Each Floor Electric Materials

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
MK 2 Gang Steel Box60.0Nos804,800
MK 3 Gang Steel Box20.0Nos1102,200
6"x4" Joint Steel Box32.0Nos1203,840
DB Box (Havels)4.0Nos4,50018,000
Electric Contractor Charge5600.0sft35196,000
Sub Total751,960

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.42 / 47
43

Detail project cost · item 14 of 14 · sheet 1 of 3

WINSTONE DREAM PARK

Detail project cost · item 14 of 14 · sheet 1 of 3

Each Floor Sanitary Materials

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
Pipe :
4" UPVC Pipe-3.00 mm (N.poly)640.0Rft7749,280
1.5" CPVC Pipe200.0Rft11523,000
1.25" UPVC Pipe-1.6 mm (N.poly)240.0Rft409,600
0.75" CPVC Pipe (N.poly)720.0Rft3525,200
0.50" GI Pipe80.0Rft574,560
Fittings:
4" UPVC Back Door Tee28.0Nos2075,796
4" UPVC Plain Tee16.0Nos1722,752
4" UPVC Plain Bend44.0Nos1205,280
4" UPVC Back Door Bend12.0Nos1672,004
4" UPVC Side Door Bend24.0Nos1674,008
4" UPVC Off-Set16.0Nos1732,768
4" UPVC Socket12.0Nos1651,980
4" UPVC Side Door Long Trap24.0Nos2556,120
0.75" CPVC Union24.0Nos1653,960
0.75" Balb Valve16.0Nos3004,800
0.75" CPVC End Plug80.0Nos221,760
Consil Stop Cock20.0Nos70014,000
500 gm Solvent Cement12.0Nos2853,420
Thread Tape120.0Nos222,640
Water Closet8.0Nos20,000160,000
Lang Pan4.0Nos1,5806,320
Lo-down4.0Nos1,2505,000

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.43 / 47
44

Detail project cost · item 14 of 14 · sheet 2 of 3

WINSTONE DREAM PARK

Detail project cost · item 14 of 14 · sheet 2 of 3

Each Floor Sanitary Materials

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
Pedestal Basin16.0Nos3,50056,000
Basin West16.0Nos70011,200
Bib Cock12.0Nos1,20014,400
Pillar Cock8.0Nos2,50020,000
Angle Stop Cock56.0Nos93052,080
Mixture Pillar Cock8.0Nos5,00040,000
Mixture Sink Cock4.0Nos5,00020,000
Sink Magic Pipe4.0Nos60240
Basin Magic Pipe16.0Nos60960
Towel Rail16.0Nos3,00048,000
Paper Holder12.0Nos2,00024,000
Soap Case16.0Nos76012,160
Mirror16.0Nos1,00016,000
Mirror Self16.0Nos80012,800
Moving Shower12.0Nos2,00024,000
Push Shower8.0Nos7005,600
Collection Pipe16.0Nos801,280
5" Zali16.0Nos1,50024,000
2" Zali12.0Nos55660
Korean Putting16.0Nos25400
Kitchen Sink4.0Nos5,00020,000
Sanitary fitting Charge(Single Line Bath)4.0Nos7,50030,000
Sanitary fitting Charge(Double Line Bath)8.0Nos9,50076,000
Sanitary fitting Charge(Kitchen & Dinning)4.0Nos7,50030,000

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.44 / 47
45

Detail project cost · item 14 of 14 · sheet 3 of 3

WINSTONE DREAM PARK

Detail project cost · item 14 of 14 · sheet 3 of 3

Each Floor Sanitary Materials

MaterialsLengthBreathHeightNosQty.UnitUnit PriceTotal Amount
Verandah Rain Water Espaut fitting Charge12.0Nos1,00012,000
Sub Total896,028

Quantities, unit prices and amounts are reproduced exactly from the supplied detail schedule. No recalculation has been applied.

WINSTONE Properties Ltd.45 / 47
46

Annexure-2 · Updated list and status of projects

WINSTONE DREAM PARK

Annexure-2 · Updated list and status of projects

Fifteen projects. One governed numbering system.

SL#Project Name / CodeCategoryLocationMain FeaturesStatus
1Winstone-10 (Dream Park)Residential CondominiumUnited City, Madani Avenue, Dhaka20 Katha, 58 Flats, B+G+M+15, 60% Green SpaceOngoing
2Silver Sun Eco ResortHospitality / Eco-ResortKuakata, Patuakhali172 Decimals, Coastal location, Share-based ownershipOngoing
3Winstone-7 (Kanan Hill)Residential ApartmentSector 16, Uttara3 Katha, 7 Single units (1,650 sqft), Park viewOngoing
4Winstone-9 (Park Shouthern)ResidentialBlock-A, Sector 17, Uttara 3rd PhaseOngoing residential project in Block-AOngoing
5Winstone-13 (Dokhonaloy)ResidentialSector 17, Uttara3 Katha, Near Uttara South Metro StationOngoing
6Winstone-15 (Metro View Park)Residential ApartmentBlock B, Sector 15, UttaraNear Metro Station & local parkOngoing
7Winstone-14 (Lake View Height)Upcoming ResidentialTo be confirmedDetails currently being processedUpcoming
8Winstone-16 (Metro Plaza)Upcoming CommercialBlock C, Sector 15, UttaraModern commercial projectUpcoming
9Winstone-1ResidentialDiabari, Turag, UttaraSuccessfully completedCompleted / Handed Over
10Winstone-2ResidentialDiabari, Turag, UttaraSuccessfully completedCompleted / Handed Over
11Winstone-3ResidentialSector 15, Uttara 3rd PhaseSuccessfully completedCompleted / Handed Over
12Winstone-4ResidentialSector 15, Uttara 3rd PhaseSuccessfully completedCompleted / Handed Over
13Winstone-5ResidentialSector 15, Uttara 3rd PhaseSuccessfully completedCompleted / Handed Over
14Winstone Green View ParkResidentialSector 17, UttaraSuccessfully completed (Archived)Completed / Handed Over
15Winstone-8 (Park Stone)ResidentialSector 15, Uttara 3rd PhaseSuccessfully completedCompleted / Handed Over

Winstone-10 is assigned exclusively to Winstone Dream Park, United City. The legacy Annexure-2 Winstone-10 entry for a 3-katha project in Sector 16 is obsolete or renumbered and must not be used for Dream Park. Portfolio total: 15 projects · 6 Ongoing · 2 Upcoming · 7 Completed.

WINSTONE Properties Ltd.46 / 47

Private enquiry

Begin a conversation about your residence.

Share your preferred apartment type and the Winstone team can respond using your submitted contact details.
Winstone Properties Ltd. logo

Find. Build. Invest.

Project profile · Closing

WINSTONE
DREAM PARK

Exclusive condominium apartment project
United City, Dhaka
+880 1805-049666info@winstonebd.comHouse #18 (4th Floor), Road #2, Block #C/1, Sector #15, Uttara, Dhaka-1230
Download PDF
WINSTONE Properties Ltd. · 47 / 47